Swarco Hitex Preformed Eco products (previously known as Hitex Hiflex Preformed) comprise of high quality synthetic resins, plasticiser, performance polymers, lead/heavy metal free pigments, aggregates, fillers and glass beads (optional).
Low cost solution for smaller marking repair areas
No specialist application operatives or heavy machinery required
Non-toxic
Heavy metal free pigments
Fast and easy to apply – flows readily, can be trafficked after approximately 5-10 mins
Surface beads stay suspended
Resistant to discolouration
Tough and durable with a long service life
No waste
Can be adapted to suit particular climatic or customer performance specifications
Compliances/Approvals
Swarco Preformed Eco meets the following International standards: BS EN 1790, BS EN 1436, BS EN 1871, AASHTO and FHWA.
BASt certification at P7 level of 4 million wheel-overs.
The management system of Swarco Hitex Traffic Safety Ltd has been assessed and registered as meeting the requirements of ISO 9001 and ISO 14001.
Application Details
The installation of Swarco Preformed Eco tape shall be as stated in the Installation Method Statement, available to download from the data sheets tab above.
Swarco Preformed Eco tape is a torch applied preformed thermoplastic tape, incorporating thermoplastic resins, aggregates, glass beads (where applicable) & fillers. It is used for reinstatement of road markings and when smaller areas of marking are required.
Swarco Preformed is supplied with surface applied glass beads, aggregate or a blend of the two. This is to provide initial reflectivity or skid resistance as required.
Suitability of the Road Surface
The system is deemed suitable for use on non-porous bitumen and concrete based highway surfaces.
Preparation of the Road Surface
The areas to which the system is to be applied shall be clearly defined by the Purchaser prior to commencement of work on-site.
The crack, seam or joint and adjacent area is thoroughly cleaned and dried, removing all loose material, dust, grease and foreign matter.
All substrates shall be inspected to ensure as to whether a primer is required or not. This can vary between sites and depends on factors such as the substrate condition and the size of logo to be applied. Worn asphaltic or concrete substrates will require priming. For concrete substrates, admixtures used during the construction process can lead to surface laitance and thus reduced adhesion.
Any laitance present must be removed by scabbling / blasting before applying Swarco Preformed Tape.
Polished or worn concrete should be treated (i.e. by blasting or scabbling) before application of Swarco Preformed Tape to ensure the strongest possible bond is formed.
Weather Conditions
Swarco Preformed can be applied when the ground temperature is between 5°C and 40°C, but should not be used in periods of continuous or heavy rain.
The time period required for the repair to cure sufficiently before trafficking depends on the substrate and air temperatures, but is typically ≤ 5 minutes. Higher ambient temperatures can increase the cure time – see the installation & aftercare sections for details.
Installation
System Installation Procedure
The application area and immediate surrounding areas must be clean, dry and free from ice, loose aggregate, oil, grease, road salt and other loose material.
Swarco Preformed is supplied ready to apply, either on rolls or in strips, incorporating surface applied glass beads, aggregate or a mixture of the two.
Larger areas may require the use of a clear primer to ensure that the adhesion is maximized. Primer should be applied in accordance with manufacturer’s instructions. Particular care should be taken to avoid pools or puddles of primer, as these can cause blisters, which can lead to failure of any preformed tape applied on top.
Swarco Preformed Tape should be removed from the packaging and gently placed onto the surface over the top of the crack or joint. If required, it should then be carefully cut to the required size and shape before application starts.
Swarco Preformed is then applied using a suitable torch burner, applying gentle heat to the top surface of the material. The burner should be kept moving across the surface to maintain an even heating.
Heat should be applied until the material can be seen to start melting and flowing onto the underlying surface. Care should be taken to ensure that all of the material is sufficiently heated to allow all of the tape to be fully bonded to the substrate.
The bond strength should checked after the material has fully cooled. This is carried out by trying to insert a screwdriver or similar tool between the Swarco Preformed tape and the substrate. The material should not debond. If it does, repeat the above heating step and recheck.
Prolonged overheating should be avoided, as it could lead to degradation of the binder component, which will adversely affect product performance. Overheating also risks the surface applied aggregate sinking into the material, reducing the initial skid resistance.
The completed installation shall be allowed to cool before opening to traffic. This will vary according to the ambient and substrate temperatures, but is typically approximately 10 minutes.
System Installation Checks by the Installer
The installer shall carry out a visual inspection to check the finished levels and for any discernible faults. The above adhesion tests should also be carried out. Any remedial works will be carried out prior to opening the site to traffic.
Maintenance and Repair
In the event of damage occurring during service, the material can be repaired by removing defective material then repeating the preparation and application procedure.
Aftercare
During the setting period no disturbance or trafficking of the application area should be permitted.
Before opening to traffic at the end of the cooling period the installation should be inspected to ensure it is safe for trafficking
Customer agrees that before placing an Order, Customer has read and understood the most up to date Product Data Sheet for the Product. Where we have access to the Product Data Sheet from the manufacturer, we will either provide a copy on request, or include a link to the Product Data Sheet available on the manufacturer’s website. Customer further agrees that we have no liability for any errors or omissions contained within the Product Data Sheets. For more information, please see our Terms & Conditions of Sale.
Swarco Hitex Preformed Eco Thermoplastic Lines is only available with the shipping and delivery timescales listed below - please do not contact our Customer Support Team with enquiries about alternative or earlier shipping and delivery times.
Saturdays and Sundays, as well as Bank Holidays, are not classed as working days.
Orders placed after the cut-off for this product will not be processed for earliest dispatch until 9am the next working day.
Pre-formed thermoplastic lines that are fast and convenient to install, with excellent adhesion, durability, flow and colour stability.Previously known as Hitex Hiflex Preformed Suitable for:Reinstatement of markings following utility works Fast and simple installation of new letters / numbers / symbols Small scale lining work such...
A clear liquid tack coat primer designed for the adhesion of thermoplastic road markings onto bituminous and non-bituminous substrates. HT Primer is an easy to apply, low viscosity, colourless liquid tack coat primer.Previously known as Hitex HT Adhesion Primer The use of HT Primer with Hitex thermoplastic markings is strongly recommended...
Pre-formed thermoplastic symbols that are fast and convenient to install, with excellent adhesion, durability, flow and colour stability. See ordering references below.Previously known as Hitex Hiflex Preformed Suitable for:Reinstatement of markings following utility works Fast and simple installation of new letters / numbers /...
Swarco Hitex Preformed Eco (previously known as Hitex Hiflex Preformed) thermoplastic letters and numbers that are fast and convenient to install, with excellent adhesion, durability, flow and colour stability.Suitable for:Reinstatement of markings following utility works Fast and simple installation of new letters / numbers / symbols...
Fast and convenient to install with excellent adhesion, durability, stability and skid resistance.Previously known as Hitex Hiflex PreformedNo specialist application operatives or heavy machinery required Non-toxic Heavy metal free pigments Fast and easy to apply - can be trafficked after approximately 5-10 mins Surface aggregates stay...
Pre-formed thermoplastic road markings that are fast and convenient to install, with excellent adhesion, durability, flow and colour stability.More Information Delivery Info See More Thermoplastic Symbols & Lines