Swarco Hitex Swarcoplast PumaTrack Cycle Path and Walkway Paint

    HIT9722
    HIT9722

    Coloured MMA Road Surface Treatment. Quick and easy to install and ideal for walkways and cycle paths, PumaTrack surface treatment is engineered to achieve the highest levels of durability, adhesion and colour stability. Smooth or textured finish, depending on application.

    • Separate hardener (BPO Powder Catalyst) required, levels depend on substrate temperature
    • Simple application ensures even, slip resistant finish
    • Good slip resistance providing enhanced safety
    • Tough and durable with a long service life
    • Catalyst controlled, rapid curing, typically 30-40 minutes
    • Non-toxic binder system - Fast and easy to apply - Highly resistant to discolouration
    • Can be used on concrete or metal surfaces with CM Primer
    • Can be adapted to suit particular climatic requirements
    • Wide colour range - bespoke colours can be made on request, longer lead times may apply. Contact our sales team with your requirements on 0113 2455450 or send a message to [email protected]

    Product customisation

    Don't forget to save your customization to be able to add to cart
    • 250 char. max
    Colour Group
    Size

    £78.01 (incl. VAT)

    £65.01 (ex. VAT)

    Quantity
    Please choose your colour
    Available for Delivery (See Delivery Options Below)

    Description

    PumaTrack comprises of an MMA binder system, lead/heavy metal free pigments, aggregates and fillers. PumaTrack is available in a wide range of colours, making it suitable for many different schemes.



    Quick Links - Click To Jump To Section:




    Features & Benefits


    • Simple application ensures even, slip resistant finish
    • Good slip resistance providing enhanced safety
    • Tough and durable with a long service life
    • Catalyst controlled, rapid curing, typically 30-40 minutes
    • Non-toxic binder system
    • Fast and easy to apply
    • Highly resistant to discolouration
    • Can be used on concrete or metal surfaces with Swarcoplast Primer Roll 120 (previously CM Primer)
    • Can be adapted to suit particular climatic requirements
    • Typical uses:
      • Cycle routes
      • Paths/walkways
      • Smaller scale works e.g. car parks, factory loading bays
      • Road crossings



    Compliances/Approvals


    Compliant with BS EN 1871 Physical Properties.

    The management system of Swarco Hitex Traffic Safety Ltd has been assessed and registered as meeting the requirements of BS EN ISO 9001 and BS EN ISO 14001.



    Technical Data


    PumaTrack requires the use of a catalyst to enable curing of the system.

    Physical Properties
    Typical coverage rate per m2 (Based on application thickness of 2-3mm)2.0-2.8 kg/m2
    SRV (When installed via correct back-rolling)50+
    Pot life*10 – 20 mins
    Curing time*30-40 mins
    Road surface temperature range0 - 40°C
    Maximum relative humidity85%

    * Dependant on ambient temperature and catalyst dosage



    Application Details


    PumaTrack is applied to the substrate using a squeegee. For a textured slip-resistant surface, finish with roller or apply suitable aggregate.

    On concrete, polished or metal surfaces Swarcoplast Primer Roll 120 (previously CM Primer) should be applied to the surface before application. New bituminous substrates should be allowed to weather for a minimum of 28 days with suitable adhesion tests to be carried out on small areas before installation.

    • The installation and composition of PumaTrack Rollable Road Surfacing System shall be as stated in the product specification and this installation method statement.
    • PumaTrack Rollable Road Surfacing System consists of a Methyl Methacrylate binder, blended fillers, pigment(s), aggregate, and property modifying additives.
    • A programme of work shall be agreed with the purchaser prior to commencement of installation. Requirements for the provision of sufficient working area, plant, safety and, if required, protection to the system shall be agreed.
    • The current installation method statement together with all the necessary Health & Safety data sheets and COSHH risk assessment shall be deposited with the purchaser and maintained on-site.

     

    Suitability of the Road Surface

    • The system is deemed suitable for use on Highways with concrete or bituminous surfaces.
    • The purchaser should ensure that the pavement structure is adequate to support the traffic without undue cracking or deformation during the expected life of the system.
    • New bituminous substrates should be allowed to weather for at least 6-8 weeks prior to the installation of the system. This is because new bituminous substrates can contain residues of oils and additives which can inhibit adhesion and curing. Depending on the type of substrate, this can take even longer than 8 weeks, and tests should be carried out on a small area before the full application commences to ensure the adhesion is fine.
    • Concrete surfaces should be a minimum of 28 days old and must be primed using a Swarcoplast Primer Roll 120 (previously CM Primer) prior to the installation of the system.

     

    Preparation of the Road Surface

    • The areas to which the system is to be applied shall be clearly defined and marked by the Purchaser prior to commencement of work on-site.
    • Any imperfections in the road surface not acceptable to the Installer shall be reinstated with a material approved by the Purchaser in consultation with the Installer.
    • The road surface shall be clean, dry and free from ice, frost, loose aggregate, oil, grease, road salt and other loose matter that may impair the adhesion of the system.
    • Where the road surface does not comply with the above it shall be cleaned by the Installer or others, by grit blasting, high pressure water jetting, low pressure water/abrasive blast cleaning, scarifying, scabbling or other means approved by the Purchaser. To remove dust and other loose matter the road surface should be vigorously brushed or treated with hot compressed air. Any oil visible on the road surface shall be removed by washing and scrubbing with a suitable detergent solution followed by flushing with clean water or by other suitable means.
    • Existing road markings, ironwork, road edges of area to be treated and road studs shall be suitably masked.
    • On concrete substrates, Swarcoplast Primer Roll 120 (previously CM Primer) shall be applied using a short pile paint roller or serrated edge squeegee at a typical coverage rate of 0.4kg/m², depending on the substrate texture and porosity. The road surface temperature shall be between 0 and 40°C. The Swarcoplast Primer Roll 120 (previously CM Primer) needs to be catalysed according to the following table:

     

    Catalyst Addition Levels when using Swarcoplast Primer Roll 120 (previously CM Primer)

    Substrate temperature (ºC)Primer pack size (kg)BPO powder catalyst required (g)
    0-5201200
    5-1520800
    15-2520400
    25-4020200

     

    Weather Conditions

    • Installation of the system shall only be carried out with a road surface temperature of 0°C to 40°C and with a relative humidity of ≤85%. At temperatures below 5⁰C, the pails should be warmed to above 5⁰C.
    • Ambient and road surface temperatures shall be recorded at the start and, if the weather is variable, during the installation process.
    • Road surfaces shall be dry before and during the installation of the system.
    • The curing period for the prevailing weather conditions shall be notified to the Purchaser.



    Installation


     

    System Installation Procedure

    • The PumaTrack system is available as a single grade for use at substrate temperatures from 0°C to 40°C
    • PumaTrack pails should be kept out of direct sunlight during storage and use. Storage at elevated temperatures can lead to degradation of the system. Application of hot PumaTrack material can lead to premature gelling or curing, which can adversely affect product performance.
    • PumaTrack rollable surfacing system is a two-component cold applied chemically curing Methyl Methacrylate compound, consisting of a pre- accelerated base resin, blended fillers, pigment(s), aggregate, trace amounts of property modifying additives and a powder catalyst (BPO), supplied in pre- weighed quantities ready for on-site mixing. For the amount of BPO powder catalyst required for the installation temperature, see the following table:

     

    Catalyst Addition Levels when using PumaTrack

    Substrate temperature (ºC)PumaTrack pack size (kg)BPO powder catalyst required (g)
    0-520500
    5-1520400
    15-2520200
    25-4020100

     

    Substrate temperature (ºC)PumaTrack pack size (kg)BPO powder catalyst required (g)
    0-510250
    5-1510200
    15-2510100
    25-401050

     

    • The catalyst level is critical – the minimum catalyst level is 100g per 20kg pail. Using less catalyst will cause partial curing and lead to product failure. Excessive levels of catalyst can lead to premature gelling and curing, which can lead to reduced adhesion to the substrate and product failure.
    • Immediately prior to use, stir the pail thoroughly using a mechanical mixer until the resin is fully mixed. Add the correct amount of BPO powder catalyst and mix thoroughly for at least 30 seconds. Ensure that the binder at the bottom and sides of the container is completely mixed in. Do not delay once the catalyst has been added, as a chemical reaction is occurring that if left in the pail will ruin the mix.
    • The mixed binder and catalyst shall then be immediately spread onto the dry prepared road surface uniformly with a serrated squeegee at the desired thickness. Typically a 4mm serrated squeegee will be used to give a uniform thickness of 2mm. For higher levels of durability, a thicker squeegee should be used (e.g. 6mm). The binder should then be backrolled to give the desired texture depth. A short pile roller can be used to give a finer texture depth.
    • The applied material should be rolled as soon as possible after being squeegeed to avoid any gelling or partial curing before the texture has been rolled in.
    • If there is any delay to the work, the squeegee must be checked before work restarts to ensure that no cured material is left on the squeegee, which could lead to lower coverage rates, and thus reduced durability.
    • The squeegee should also be regularly inspected to ensure that there is no wear to the teeth, as this can also lead to lower coverage rates and reduced durability.
    • PumaTrack is made to tight quality tolerances. However, for larger areas, use material with the same batch number wherever possible. If different batch numbers are used on a single area, colour comparison checks should be made between each batch of product being used before any application starts.
    • On more open textured surfaces a greater material usage may be required to ensure adequate coverage of the surface.
    • The masking tape shall be removed promptly as the work progresses, before the binder begins to gel.

     

    System Installation Checks by the Installer

    • A visual check shall be carried out for uniform surface texture, blemishes, and any discernible faults.
    • A check shall be made on completion of each site to determine the quantities of material used.

     

    Maintenance and Repair

    • In the event that damage occurs during the installation or during service the system shall be repaired as follows:
      • The damaged and or de-bonded system shall be cut back to firmly adhering material, squaring off the area to be reinstated.
      • The area to be repaired shall be cleaned, dried and the perimeter masked, allowing a 50 mm overlap on the existing well adhered system.
      • The system shall then be applied in accordance with the system installation procedure.

     

    Aftercare

    • Any remaining masking shall be removed and the system allowed to fully cure. During the curing period, no disturbance or trafficking of the system shall be permitted.
    • The Installer should endeavour to inspect the site after 24 hours and carry out any necessary remedial work.



    Product Details
    9722-969745

    Data sheet

    For Use By
    Professional Use
    Interior / Exterior Use
    Exterior Use
    For Use On
    Bituminous Surfaces
    For Use On
    Metallic Substrates
    For Use On
    Concrete
    Application Method
    Squeegee
    Single, Two or Three Pack
    Two-Pack
    Pack Size
    10KG
    20KG
    Coverage
    2.0-2.8 kg/m²
    Max. Application Temperature
    40°C
    Min. Application Temperature
    0°C
    UN Number
    UN1263
    Pot Life
    10 – 20 mins
    Fully Cured
    30-40 mins
    Suitable For Use On
    Bituminous Surfaces
    Suitable For Use On
    Concrete
    Suitable For Use On
    Asphalt
    Suitable For Use On
    Metal
    Suitable For Use On
    Tarmac
    Application Method
    Squeegee
    Components
    2K
    Product Usage Type
    Topcoat
    Colour Family
    Red
    Colour Family
    Pink
    Colour Family
    Yellow
    Colour Family
    Grey
    Colour Family
    White
    Colour Family
    Blue
    Colour Family
    Brown
    Colour Family
    Orange
    Colour Family
    Black
    Colour Family
    Green
    Anti-Slip Texture
    Coarse Texture
    Categorised As
    Floor Paints > Low Temperature Anti-Slip Floor Paints
    Seasonal
    Cold Weather
    Product Type
    MMA
    Attachments
    Download


    Customer agrees that before placing an Order, Customer has read and understood the most up to date Product Data Sheet for the Product. Where we have access to the Product Data Sheet from the manufacturer, we will either provide a copy on request, or include a link to the Product Data Sheet available on the manufacturer’s website. Customer further agrees that we have no liability for any errors or omissions contained within the Product Data Sheets. For more information, please see our Terms & Conditions of Sale.


    Be the first to ask a question about this product!


    Question about the product

    * Required fields
    (read)
    Send

    IMPORTANT SHIPPING & DELIVERY INFORMATION

    Swarco Hitex Swarcoplast PumaTrack Cycle Path and Walkway Paint is only available with the shipping and delivery timescales listed below - please do not contact our Customer Support Team with enquiries about alternative or earlier shipping and delivery times.

    Saturdays and Sundays, as well as Bank Holidays, are not classed as working days.

    Orders placed after the cut-off for this product will not be processed for earliest dispatch until 9am the next working day.

    All delivery costs below are excluding VAT


    You might also like

    Swarco Hitex BPO Powder Catalyst

    A separate catalyst system to enable curing for Hitex marking products. Dosage of the catalyst varies according to material temperature.IMPORTANT - refer below for levels required when using with PumaBrite, PumaTrack, and CM PrimerMore Information Delivery Info

    Price £4.61 (ex. VAT)

    £5.53 (incl. VAT)

    £4.61 (ex. VAT)

    In Stock and Available for Delivery

    Swarco Hitex Swarcoplast Primer Roll 120

    Primer for Swarco Hitex Puma MMA systems on metal and concrete substrates (e.g. iron, aluminium, stainless steel), with excellent adhesion.Previously known as CM Primer Easy to apply Separate hardener (Hitex BPO Powder Catalyst) required, levels depend on substrate temperatureMore Information Delivery Info Hitex BPO Powder Catalyst...

    Price £277.50 (ex. VAT)

    £333.00 (incl. VAT)

    £277.50 (ex. VAT)

    In Stock and Available for Delivery