

Cromadex FP2 Two Pack Epoxy Maintenance Finish is a two pack epoxy floor paint for use in the factory maintenance and refurbishment environment. The product has excellent chemical resistance allowing it to be used in more aggressive environments. Available in a wide range of colours and gloss levels, including BS, RAL all in a lead free finish.
Please note: Colours are sold in the nearest tin size but actual paint volume per tin may vary up to 10% depending on colour.
Cromadex FP2 Two Pack Epoxy Maintenance Finish is a two pack epoxy floor paint for use in the factory maintenance and refurbishment environment. The product has excellent chemical resistance allowing it to be used in more aggressive environments.
Cromadex FP2 Two Pack Epoxy Maintenance Finish is available in the full Cromadex range of colours and gloss levels, including BS, RAL all in a lead free finish. In common with all epoxies, Cromadex FP2 will chalk and discolour on exterior exposure. However, this will have no adverse effect on anti-corrosion properties.
Suitable Substrates and Preparation
Concrete: Suitable for sound concrete aged for 3 months. For porous surfaces apply sealer coat thinned with 5% 85-72 Thinner by brush or roller then one full unthinned coat.
Sound existing paint work: Ensure surface is clean, dry & free from all contamination. Abrade surface to provide key. It is recommended that a test area is prepared prior to full coating to determine compatibility with painted surface. Apply product unthinned.
7.5L unit comprises;
5L of FP2 Base + 2.5L of FP2 Curing Agent
30L unit comprises;
20L of FP2 Base + 10L of FP2 Curing Agent
Note: Please refer to the product data sheet for mixing ratios - different sheen levels have different ratios.
Clear is available in all gloss levels like the colours, however all finishes other than gloss in the clear may appear cloudy for certain applications - a test area when using clear is always recommended.
Customer agrees that before placing an Order, Customer has read and understood the most up to date Product Data Sheet for the Product. Where we have access to the Product Data Sheet from the manufacturer, we will either provide a copy on request, or include a link to the Product Data Sheet available on the manufacturer’s website. Customer further agrees that we have no liability for any errors or omissions contained within the Product Data Sheets. For more information, please see our Terms & Conditions of Sale.
Cromadex FP2 Two Pack Epoxy Maintenance Finish is only available with the shipping and delivery timescales listed below - please do not contact our Customer Support Team with enquiries about alternative or earlier shipping and delivery times.
Saturdays and Sundays, as well as Bank Holidays, are not classed as working days.
Orders placed after the cut-off for this product will not be processed for earliest dispatch until 9am the next working day.
All delivery costs below are excluding VAT