Carboline Carboweld 11 is a weldable pre-construction inorganic zinc primer for shop use only. Designed to protect steel during construction phase of projects under normal conditions.
Weld spatter does not adhere to or damage the coating
Dries to touch and to handle in 3 to 5 minutes
Certified as a pre-construction primer for Lloyds Register constructions
Carboline Carboweld 11 is a weldable pre-construction inorganic zinc primer for shop use only. Designed to protect steel during construction phase of projects under normal conditions, Carboweld 11 can be topcoated for additional long-term protection for atmospheric exposures.
Welds made over Carboweld 11 coated steel are equal in every respect to welds made to uncoated steel. Can be welded as quickly and easily as bare steel at production line speeds without loss in strength or consistency of the weld.
Weld spatter does not adhere to or damage the coating
Dries to touch and to handle in 3 to 5 minutes
Certified as a pre-construction primer for Lloyds Register constructions
Grey in colour
Flat finish
Product Specification
Technical Data
Carboline Carboweld 11
Volume Solids:
85% ± 1%
By Weight 48%
Theoretical Coverage Rate:
16.1 m²/l at 17 microns
Dry Film Thickness:
0.6 - 0.8 mils (15 - 20 microns) in a single coat. Thicknesses up to 1.5 mils (37 microns) are also acceptable.
VOC Values:
As Supplied: 696 g/l
Thinner 21: 25.6 oz/gal: 718 g/l
Thinner 33: 25.6 oz/gal: 730 g/l
Limitations:
For projects with extended construction phases consult Rawlins on Tech - 0113 2455450 (option 2) or [email protected] for more suitable primers
For shop use only
Flash Point:
11°C for Base
Shelf Life:
Part A: 18 months at 24°C
Part B: 24 months at 24°C
Storage Temperature and Humidity:
4°-43°C
0-95% Relative Humidity
Drying Times
Curing Schedule
Surface Temp
Dry to Handle
Final Cure General
-18°C
2 Hours
5 Days
4°C
40 Minutes
12 Hours
16°C
15 Minutes
6 Hours
27°C
5 Minutes
4 Hours
38°C
3 Minutes
2 Hours
Drying times are based on a 20-40 micron dry film thickness. Higher film thickness, insufficient ventilation or cooler temperatures will require longer cure times and could result in solvent entrapment and premature failure
For shop applications or if the relative humidity is too low, the curing time can be reduced by raising the relative humidity by steam or water spray on the coated surface after an initial dry time of 1 hour at 24°C
Surface Preparation
General
Remove all oil or grease from the surface to be coated with Thinner 2 or Surface Cleaner 3 (refer to Surface Cleaner 3 Instructions) in accordance with SSPC-SP1
Steel
Abrasive blast to achieve a sharp angular profile of 1.0-1.5 mils for most applications. Where high build topcoats are used; 1.5-2.5 mil blast profile is recommended
Stainless Steel
Abrasive blast to a 1-1.5 mil profile and apply material direct to substrate or over appropriate nonzinc primer
Immersion (see Limitations): SSPC-SP10
Non-Immersion: SSPC-SP6
Welding Data
Automatic- Carboweld 11 when applied at recommended thickness may be welded at speeds up to 48” per minute. This is dependent upon plate thickness and bead size. This includes the following processes: 1) Submerged arc 2) Flux core 3) Short arc and 4) Metal Inert Gas (MIG)
Application Methods
Product Information
Mixing:
Power mix base, then combine parts, sifting zinc filler slowly into base and mixing with continuous agitation. Mix until free of lumps. Pour mixture through 30 mesh screen
Do not mix partial kits
Keep under mild agitation during application
Thinning:
Not normally required, but may be thinned up to 25.6 ounces per gallon with Thinner 21 in cool weather (below 4°C)
For hot or windy conditions, use Thinner 33 up to 25.6 ounces per gallon
Use of thinners other than those supplied or recommended by Carboline may adversely affect product performance and void product warranty, whether express or implied
Ratio:
3 Gal Kit
Part A (Base): One 5-gal can (partially filled)
Part B (Zinc Filler Type II): 14.6 lb unit (6.6 kg)
15 Gal Kit
Part A (Base): Three 5-gal cans (partially filled)
Part B (Zinc Filler Type II): 73 lb. unit (33.1 kg)
Pot Life:
48 Hours at 24°C and less at higher temperatures. Pot life ends when coating becomes too viscous to use
Spray Application:
Agitate the mixed material continuously during the spraying operation. If spraying stops for more than 15 minutes, recirculate the material remaining in the spray line
Conventional Spray:
Pressure pot with dual regulators, agitator, 3/8” I.D. minimum hose, 50’ maximum material hose length .070” I.D. fluid tip and appropriate air cap. Keep pot at same level as application
Airless Spray:
Pump Ratio: 30:1 min
Volume Output: 3.0 gpm min
Material Hose: 3/8” I.D. min
Tip Size: .019-.023”
Output PSI: 1500-2000
Filter Size: 60 mesh
Brush:
For touch up of areas less than one square foot only. Use medium bristle brush and avoid over brushing
Roller:
Do not apply by roller
Application Conditions
Product Conditions
Condition
Material
Surface
Ambient
Humidity
Minimum
-18°C
-18°C
-18°C
30%
Maximum
54°C
93°C
54°C
95%
This product simply requires the substrate temperature to be above the dew point
Condensation due to substrate temperatures below the dew point can cause flash rusting on prepared steel and interfere with proper adhesion to the substrate
Special application techniques may be required above or below normal application conditions
In case of spillage, absorb and dispose of in accordance with local applicable regulations
Safety
Read and follow all caution statements on this product data sheet and on the safety data sheet for this product and use personal protective equipment as directed
Employ normal workmanlike safety precautions
Hypersensitive persons should wear protective clothing, gloves and use protective cream on face, hands, and all exposed areas
Ventilation
When used as a tank lining or in enclosed areas, thorough air circulation must be used during and after application until the coating is cured
The ventilation system should be capable of preventing the solvent vapor concentration from reaching the lower explosion limit for the solvents used
User should test and monitor exposure levels to insure all personnel are below guidelines
If not sure or if not able to monitor levels, use MSHA/NIOSH approved respirator
Customer agrees that before placing an Order, Customer has read and understood the most up to date Product Data Sheet for the Product. Where we have access to the Product Data Sheet from the manufacturer, we will either provide a copy on request, or include a link to the Product Data Sheet available on the manufacturer’s website. Customer further agrees that we have no liability for any errors or omissions contained within the Product Data Sheets. For more information, please see our Terms & Conditions of Sale.
Carboline Carboweld 11 is only available with the shipping and delivery timescales listed below - please do not contact our Customer Support Team with enquiries about alternative or earlier shipping and delivery times.
Saturdays and Sundays, as well as Bank Holidays, are not classed as working days.
Orders placed after the cut-off for this product will not be processed for earliest dispatch until 9am the next working day.
We no longer stock this product; please contact our technical team on 0113 2455450 (option 2) or send a message to [email protected] where we will be happy to find an alternative product. Carboline Surface Cleaner 3 is a cleaning agent used for degreasing and cleaning contaminated surfaces prior to painting. May be used to clean...
We no longer stock this product; please contact our technical team on 0113 2455450 (option 2) or send a message to [email protected] where we will be happy to find an alternative product.
These surface preparation kits for steel have been created to help provide customers with an easily accessible bundle of tools to aid in the preparation of steel surfaces in accordance with ISO 8501-1 (St2/3) and SSPC (SP 2/3). Please click here for important information about these kits. Kit Contents: SET 1 (Hand Tools)1 x Rust-Oleum...