Sherwin-Williams Transgard TG111V2 is a high build 2-pack epoxy zinc phosphate primer/buildcoat, designed as anti-corrosive protection of carbon steel surfaces prepared by abrasive blast cleaning.
High build 2-pack epoxy
Designed as anti-corrosive protection of carbon steel surfaces
Can be applied at thicknesses between 75 and 150 microns dry to provide both primer and buildcoat in a single coat
Please Note: This product is made to order and is therefore subject to a minimum order quantity of 150L and an extended lead time - please contact our sales team on0113 2455450or send a message to[email protected]for details
Sherwin-Williams Transgard TG111V2 is a high build 2-pack epoxy zinc phosphate primer/buildcoat, designed as anti-corrosive protection of carbon steel surfaces prepared by abrasive blast cleaning.
Transgard TG111V2 can be applied at thicknesses between 75 and 150 microns dry to provide both primer and buildcoat in a single coat. A topcoat is only required for decorative purposes. Without a topcoat, the material will quickly discolour and patchiness may be exaggerated due to film thickness variation, but the coating will nonetheless provide excellent anti-corrosive protection as a single coat protective epoxy and the intercoat adhesion will not be affected by any discolouration.
Please Note: This product is made to order and is therefore subject to a minimum order quantity of 150L and an extended lead time - please contact our sales team on0113 2455450or send a message to[email protected]for details.
Endorsements
Highways Agency Item No. 111.
Recommended Topcoats
For overcoating with epoxy products (including self overcoating), the maximum recommended interval is 28 days at 23°C. For overcoating outside this interval, consult Sherwin-Williams technical support for advice.
Where a high degree of gloss and colour retention is required, overcoat with Acrolon C137V2 or Transgard TG169 within 7 days at a minimum d.f.t. of 50 microns. These overcoating times refer to achievement of optimum adhesion at 23°C and will vary with temperature.
For overcoating outside the above parameters, consult Technical Team for advice.
Surface Preparation
Blast clean to Sa21⁄2 BS EN ISO 8501-1:2007). Average surface profile in the range 50-75 microns.
Manually prepared surfaces should be prepared to a minimum standard of St3 ISO 8501-1:2007 at the time of coating.
Ensure surfaces to be coated are clean, dry and free from all surface contamination.
May also be applied over a wide range of pre-fabrication primers, including inorganic zinc silicate, and epoxy types.
Customer agrees that before placing an Order, Customer has read and understood the most up to date Product Data Sheet for the Product. Where we have access to the Product Data Sheet from the manufacturer, we will either provide a copy on request, or include a link to the Product Data Sheet available on the manufacturer’s website. Customer further agrees that we have no liability for any errors or omissions contained within the Product Data Sheets. For more information, please see our Terms & Conditions of Sale.
These surface preparation kits for steel have been created to help provide customers with an easily accessible bundle of tools to aid in the preparation of steel surfaces in accordance with ISO 8501-1 (St2/3) and SSPC (SP 2/3).
Please click here for important information about these kits.
Kit Contents:
SET 1 (Hand Tools)
1 x Rust-Oleum...