Carboline Phenoline 311 Primer is a two-component, tank lining holding primer that has a variety of attributes including low-temperature cure, fast recoat times, moisture tolerance during application and cure, and excellent blast-hold protection. Often used with thick film lining systems as a holding primer (maintain blast cleaning) and is suitable for both new tanks and relines.
Carboline Phenoline 311 Primer is a two-component tank lining holding primer that has a variety of attributes including low-temperature cure, fast recoat times, moisture tolerance during application and cure, and excellent blast-hold protection.
Phenoline 311 Primer is often used with thick film lining systems as a holding primer (maintain blast cleaning) and is suitable for both new tanks and relines. It exhibits excellent surface wetting characteristics and quick cure for handling. It contains high levels of inert flake reinforcement. Excellent for use as a bonding primer for linings when damp concrete or masonry substrates are encountered.
Technical Data | ||||||
---|---|---|---|---|---|---|
Carboline Phenoline 311 Primer | ||||||
Volume Solids: | 47% +/- 2% | |||||
Theoretical Coverage Rate: | 18.5 m²/l at 25 microns 6.2 m²/l at 75 microns | |||||
Allow for loss in mixing and application | ||||||
Dry Film Thickness: | 25 - 76 microns typical | |||||
Do not exceed 3 mils | ||||||
HAPs Values: | 1.64 lbs/solid gallon | |||||
VOC Values: | Per EPA Method 24: 231 g/l mixed 6 oz/gal of Thinner 225 E: 231 g/l These are nominal values and may vary slightly with colour. Product contains VOC-exempt t-butyl acetate. Check local regulations regarding product usage | |||||
Dry Temp. Resistance: | Continuous: 82°C | |||||
Non-Continuous: 104°C | ||||||
Primer: | Self-priming | |||||
Topcoats: | Topcoat selection will depend on exposure | |||||
Limitations: | Epoxies lose gloss, discolour, and eventually chalk in sunlight exposure | |||||
Flash Point: | Part A: 21°C Part B: 33°C | |||||
Shelf Life: | Part A: 12 months at 24°C Part B: 24 months at 24°C | |||||
Storage Temperature and Humidity: | 4°C-38°C | |||||
0-95% Relative Humidity |
Curing Schedule | |||
---|---|---|---|
Surface Temp | Dry to Handle | Dry to Topcoat Minimum | Maximum Recoat Time |
-7°C | 36 Hours | 24 Hours | 45 Days |
2°C | 16 Hours | 2 Hours | 45 Days |
10°C | 10 Hours | 1 Hour | 30 Days |
24°C | 3 Hours | 30 Minutes | 30 Days |
32°C | 90 Minutes | 30 Minutes | 3 Days |
General
Steel
Concrete:
Product Information | |
---|---|
Mixing: | Mix separately, then combine and mix in the following proportions (3:1 ratio): 1 Gal. Kit
4 Gal Kit
|
Thinning: | Thinning not normally required. May be thinned up to 6 oz/gal with Carboline exempt Thinner 225 E to maintain VOC. Maintain constant agitation to ensure consistency due to settling. Tip: If spraying is stopped for more than 10 minutes it is advisable to recirculate the material lines |
Pot Life: | 3 hours at 24°C and less at higher temperatures. Pot life ends when coating becomes too viscous to use |
Conventional Spray: | Pressure pot equipped with dual regulators, 3/8” I.D. minimum material hose, 0.070” I.D. fluid tip and appropriate air cap |
Airless Spray: | Pump Ratio: 30:1 (min.) GPM Output: 2.5 (min.) Material Hose: 3/8” I.D. (min.) Tip Size: 0.015-0.019” Output PSI: 2000-2500 |
Brush and Roller: | Multiple coats may be required to obtain desired appearance, recommended dry film thickness, and adequate hiding Avoid excessive re-brushing or re-rolling. For best results, tie-in within 10 minutes at 24°C. Use a short-nap synthetic roller cover with solvent resistant core |
Product Conditions | |||||
---|---|---|---|---|---|
Condition | Material | Surface | Ambient | Humidity | |
Minimum | 7°C | -7°C | -7°C | 0% | |
Maximum | 32°C | 49°C | 38°C | 95% |
Clean Up
Safety
Ventilation
Caution
Customer agrees that before placing an Order, Customer has read and understood the most up to date Product Data Sheet for the Product. Where we have access to the Product Data Sheet from the manufacturer, we will either provide a copy on request, or include a link to the Product Data Sheet available on the manufacturer’s website. Customer further agrees that we have no liability for any errors or omissions contained within the Product Data Sheets. For more information, please see our Terms & Conditions of Sale.
Carboline Phenoline 311 Primer is only available with the shipping and delivery timescales listed below - please do not contact our Customer Support Team with enquiries about alternative or earlier shipping and delivery times.
Saturdays and Sundays, as well as Bank Holidays, are not classed as working days.
Orders placed after the cut-off for this product will not be processed for earliest dispatch until 9am the next working day.
All delivery costs below are excluding VAT
Carboline Thinner 2 is a thinner for use in industrial coatings.More Information Delivery Info
We no longer stock this product; please contact our technical team on 0113 2455450 (option 2) or send a message to [email protected] where we will be happy to find an alternative product.
These surface preparation kits for steel have been created to help provide customers with an easily accessible bundle of tools to aid in the preparation of steel surfaces in accordance with ISO 8501-1 (St2/3) and SSPC (SP 2/3). Please click here for important information about these kits. Kit Contents: SET 1 (Hand Tools)1 x Rust-Oleum...