Teamac 2 Pack Zinc Phosphate Primer

514/Q113/224
TEA777

Teamac 2 Pack Zinc Phosphate Primer, is a two pack, high performing epoxy zinc phosphate primer for application to steel which is clean and free from scale and/or rust.

  • For application to blast cleaned and other suitably prepared steel surfaces
  • Dry to recoat in as little as 2 - 4 hours
  • Up to 12 square metres per litre coverage
  • Not suitable for use as a weld through blast primer
  • Professional use only - from the 24th August 2023, adequate training is required before industrial or professional use of this product. Should you require training, visit - https://www.safeusediisocyanates.eu/
  • Click to jump down to Technical Data

Colour
Size
Finish
£22.97(ex. VAT)
£27.57 (inc. VAT)
Quantity
Please choose your colour
Available for Delivery (See Delivery Options Below)

Description

Professional use only - from the 24th August 2023, adequate training is required before industrial or professional use of this product. Should you require training, visit - https://www.safeusediisocyanates.eu/

Teamac 2 Pack Zinc Phosphate Primer, is used for application to blast cleaned and other suitably prepared steel surfaces. It is not suitable for use as a weld through blast primer. Provided the steel has been cleaned effectively an outstanding bond is formed between primer and metal.



Click To Jump To Section:




Features & Benefits




Product Specification


Technical Data
Volume Solids 42%
VOC Content 500 g/litre
SG 1.25 @ 20°C
Viscostity N/A
Flash Point 25°C (closed cup)
Pot Life 24 Hours @ 20°C



Pot Life - Once the parts are mixed together the material has to be used within the time stated.



Film Thickness Range And Coverage


Product Data
  Dry Film Thickness Wet Film Thickness Theoretical Coverage
Maximum 35 to 75 μm 85 to 180 μm
  • 12 m2/litre @ 35 micron D.F.T.
  • 5.5 m2/litre @ 75 microns D.F.T



The practical spreading rate may be lower as this depends on factors such as the porosity and roughness of the surface to be painted and material losses during application.



Drying Times


Drying Times At 20°C/RH 50%
Touch Dry: 20 - 30 Mins
Dry To Handle: 2 - 4 Hours
Dry To Recoat: 2 - 4 hours
Fully Cured: 3 - 5 Days



Low temperature and high humidity will adversely affect application, drying and performance of any coating.



Surface Preparation


  • Ensure all surfaces are clean, dry and free from grease, oil and any other contaminates.
  • Bare steel should be free from dust, rust and scale.
  • Blast cleaning to SA 2½ is recommended.
  • If blast cleaning is impractical, mechanical cleaning should be employed as hand cleaning does not clean the steel to the required degree.
  • Any oil or grease should be removed with solvent before de-rusting.
  • Where blast cleaning is carried out after assembly, special attention must be paid to edges, corners, nuts, bolts welds, etc.
  • Welds should, if necessary be ground and all weld spatter, slag etc. must be removed.



Preceeding Coat


  • Can be applied over 2 pack zinc phosphate blast primers which are free from contamination.



Subsequent Coat


  • Most one-pack and two-pack materials.



Mixing


  • By volume, mix 4 parts of the base with 1 part of the activator, as the ratio supplied. These should be thoroughly mixed together, preferably by slow speed electric mixer and allow to stand for 20 minutes before use. Ensuring the material is thoroughly mixed is very important - poorly mixed product can lead to soft spots and uncured coatings.
  • Thinning is not normally required for airless spray systems.
  • Use within 24 hours.
  • Clean and flush equipment immediately after use to prevent the paint solidifying in guns, pots and lines.



Application Conditions


  • As dictated by normal good painting practice. In confined spaces, provide adequate ventilation during application and drying.



Application Methods


Method Airless Spray Conventional Spray Brush Roller
  Yes No Yes No



  • Thinner (Max vol): Do Not Thin
  • Nozzle Size: .021" - .027"
  • Nozzle Pressure: 1800 - 2300 psi
  • Cleaning Solvent: Thinners 14



Health & Safety


See safety data sheet - Base - SDS 10844 Activator - SDS 10845 in the attachments section above.

Click to go back to the top of the page

Product Details
777-893909

Data sheet

Manufacturer
Teamac
For Use By
Professional Use
Water / Solvent Based
Solvent
For Use On
Steel
Application Method
Airless Spray
Brush
Sheen
Eggshell
Colour
Standard / Ready Mixed
Single, Two or Three Pack
Two-Pack
Pack Size
5L, 1L
Parts
2 Part Pack
Dry to Handle (at 20°C)
2 - 4 Hours
Dry to Recoat (at 20°C)
2 - 4 hours
Fully Cured (at 20°C)
3 - 5 Days
Recommended Thinner/Cleaner
Teamac Thinner 14
Min. Application Temperature
Should not be carried out when the ambient temperature is below 5 °C (Please note drying will be retarded below 10 °C but will stop below 5 °C)
Solids by Volume
42%
VOC
500 g/litre
Size
5 litre
Recommended Dry Film Thickness
35 to 75 μm
Recommended Wet Film Thickness
85 to 180 μm
UN Number (Activator)
UN1263
UN Number (Base)
UN1263
Base Type
Solvent-Based
Exterior / Interior Use
Exterior & Interior Use
Suitable For Use On
Steel
Finish
Eggshell
Application Method
Brush
Application Method
Airless Spray
Manufacturer
Teamac
Components
2K
Usages
Metal Primers & Undercoats
Product Type
Primer
Colour Family
Red
Colour Family
Grey
Colour Family
White
Attachments
Download


Customer agrees that before placing an Order, Customer has read and understood the most up to date Product Data Sheet for the Product. Where we have access to the Product Data Sheet from the manufacturer, we will either provide a copy on request, or include a link to the Product Data Sheet available on the manufacturer’s website. Customer further agrees that we have no liability for any errors or omissions contained within the Product Data Sheets. For more information, please see our Terms & Conditions of Sale.


Be the first to ask a question about this product!


Question about the product

* Required fields
(read)
Send

IMPORTANT SHIPPING & DELIVERY INFORMATION

Teamac 2 Pack Zinc Phosphate Primer is only available with the shipping and delivery timescales listed below - please do not contact our Customer Support Team with enquiries about alternative or earlier shipping and delivery times.

Saturdays and Sundays, as well as Bank Holidays, are not classed as working days.

Orders placed after the cut-off for this product will not be processed for earliest dispatch until 9am the next working day.

All delivery costs below are excluding VAT


You might also like

Teamac Thinner 14

A specially formulated blend of solvents designed to mix with its compatible Teamac or Coo-Var coating to create an optimal consistancy for application. Suitable for use with Brush, Roller or Spray. Teamac Thinner 14 can also be used for the cleaning of some surfaces prior to application of the coating. Also suitable for the cleaning of...

Price £10.61 (ex. VAT)
In Stock and Available for Delivery

General Painting Application Kit

General Painting Application Kit from Rawlins Paints provides the basics for any painting project. Whether it is a one off job, or you just want to make sure the right application tools get to site. Provides an economical way of making sure you will have what you need Ideal for interior and exterior paint projects Click to jump down to...

Price £8.02 (ex. VAT)
In Stock and Available for Delivery

Surface Preparation Kits for Steel

These surface preparation kits for steel have been created to help provide customers with an easily accessible bundle of tools to aid in the preparation of steel surfaces in accordance with ISO 8501-1 (St2/3) and SSPC (SP 2/3). Please click here for important information about these kits. Kit Contents: SET 1 (Hand Tools) 1 x Rust-Oleum...

Price £17.22 (ex. VAT)
In Stock and Available for Delivery