"

Rust-Oleum 9400 Rust-O-Thane SL

Rust-Oleum 9400 Rust-O-Thane SL View larger
Typical Coverage (per coat)2.3kg per m² at 1.5mm thickness
Touch Dry6 Hours
The figures stated above are approximate. Please ensure you refer to all datasheets for full application information.

Rust-Oleum 9400 Rust-O-Thane SL is a high build, self-levelling, solvent-free polyurethane for interior industrial floors. Rust-Oleum 9400 Rust-O-Thane SL should be used on cleaned, horizontal concrete or asphalt floors. Ideal for manufacturing, packaging and warehousing areas subjected to heavy foot and pallet truck traffic and where a degree of flexing of the floor is expected.

Read Full Description

More details

£238.64 + VAT

Rust-Oleum 9400 Rust-O-Thane SL is a high build, self-levelling, solvent-free polyurethane for interior industrial floors. Rust-Oleum 9400 Rust-O-Thane SL should be used on cleaned, horizontal concrete or asphalt floors. Typical uses are interior process, manufacturing, packaging and warehousing areas subjected to heavy foot and pallet truck traffic and where a degree of flexing of the floor is expected. The product offers protection against high humidity and moisture, frequent spillage of chemicals, heavy abrasion, impact, and heavy pedestrian and vehicular traffic.

Rust-Oleum 9400 Rust-O-Thane SL is applied with a rake and/or trowel and de-aeration roller. Use Rust-Oleum 5401 Epoxy Impregnation Primer or Rust-Oleum 5421 Epoxy Floor Primer Rapid on porous mineral substrates prior to application. Use Rust-Oleum B95SL Flexible Self Levelling Epoxy – diluted with 20% Rust-Oleum Thinner 641 on asphalt floors. On dense surfaces first apply a coat Rust-Oleum 3333 Super Adhesion Primer or Rust-Oleum 3366 Epoxy Powerfloat Floor Primer Rapid.

Features & Benefits

  • Good chemical resistance
  • Seamless smooth industrial finish
  • Very easy to clean and sterilise
  • Low maintenance costs
  • Flexible coating
  • Can be used on asphalt and concrete
  • Withstands heavy traffic
  • Impermeable for liquids
  • Very durable
  • Not flammable

Surface Preparation
New concrete should cure and dry for at least 30 days prior to the application of the product. Remove oil, grease and all other surface contaminations by alkaline or high pressure (steam) cleaning. Concrete curing compounds should be removed completely. All laitance, loose or unsound concrete should be removed by vacuum-blasting or etching with Rust-Oleum Mathys 108 Surfa Etch Solution. Large surfaces should preferably be prepared by abrasive blasting (vacuum blasting). If this is impossible scrabbling or roughening of the surface is necessary - Profile maximum 0.5mm.

Defects in the concrete should be repaired with Rust-Oleum 5180 Epoxy Repair Mortar or Rust-Oleum 5412 Epoxy Filler. Previously coated surfaces must be in sound condition and a test-patch is recommended to check compatibility. The surface should be clean, dry and have a strength of minimum of 25 N/mm² before the coating can be applied.

Directions for Use
Add all of Hardener B to Base A. Mix with slow speed drill and helical spinner, taking care not to entrain air. It is advisable to pour mixed contents into a second container and re-mix to ensure the product is homogenous and no soft spots are seen in the applied coating.

  • 4.9 parts of Base A are mixed with 1 part of Hardener B, by weight.
  • 3.9 parts of Base A are mixed with 1 part of Hardener B, by volume.

The product is supplied in full units as A+B. Do not split the compounds/components as this may jeopardise the end result.

Pot-life: 45 minutes at 20°C (at higher temperatures the application time is shorter).

Application
Pour the material onto the properly cleaned floor and spread it out evenly with a rake or trowel. Treat the surface directly after application with the de-aeration roller to release entrapped air and to promote the self-levelling effect.

Clean-up: Use Rust-Oleum Thinner 160.

Application Conditions
The recommended substrate and environment temperature is 15 - 25°C, but no less than 10°C. The temperature of the substrate should exceed the “dew point” by 3°C during application and hardening. Temperatures should not fall below 5°C in the 24 hours after application.

Send us your question

Be the first to ask a question about this product!

Question about the product

I have read and agree to the Conditions of Use (read) Send

The question has been correctly sent

Free delivery on orders over £75 (terms & conditions)

• Deliveries will be made within 3 working days (standard delivery)
• You must be UK mainland based for the free delivery offer.
• Postcodes listed are excluded from the free delivery and priced below.

Please note: deliveries will need to be signed for at the point of delivery.

UK Mainland OnlyUp to £75.00£75.01 +
Standard (2/3 working days)£8.00FREE
Next Day£15.00£15.00
Next day before 09:00am£30.00£30.00
Next day before 10:30am£25.00£25.00
Next day before 12:00pm£20.00£20.00
Saturday Delivery£35.00£35.00














£25 (Standard 2-3 Day Delivery Only)

AB30, AB31, AB32, AB33, AB34, AB35, AB36, AB37, AB38, AB44, AB45, AB46, AB47, AB48, AB49, AB50, AB51, AB52, AB53, AB54, AB55, AB56, FK, G83, IV, KW1, KW2, KW3, KW4, KW5, KW6, KW7, KW8, KW9, KW10, KW11, KW12, KW13, KW14, PA, PH, HS, KA27, KA28, ZE

£35 (Standard 2-3 Day Delivery Only)

BT, IM

£50 (Standard 2-3 Day Delivery Only)

JE, GY

Please note that all carriage prices are quoted without V.A.T. at the current rate.

Scottish Islands - outside standard distribution area, please contact us for a quote.

There may be an exception for heavy goods when purchased in quantity where we will contact you to advise any additional charges.

Next Day delivery and Saturday Service is available on stocked items for orders received before 11:00am only.

Because of the nature of our products, we use specially selected carriers to ensure safe and prompt delivery to you.

Please note: Any time or date named by Rawlins Paints Limited for delivery is given and intended as an estimate only and Rawlins Paints Limited shall not be liable to make good any damage or loss whether arising directly or indirectly out of a delay in delivery. Deliveries are made using a reliable nationwide carrier. Although over 99% of consignments arrive on time, we recommend that no labour is employed to undertake work until materials have arrived on site.

Rust-Oleum 9400 SL TDS

Download

Rust-Oleum 9400 SL Base MSDS

Download

Rust-Oleum 9400 SL Activator MSDS

Download