    Instarmac UltraCrete Enviro Mastic, a hot applied polymer modified mastic asphalt that gives superior performance in the patching and repairing of carriageways, footpaths, footways and cycle tracks or as a surface finish when installing street furniture and access covers.

    • Please note, this product is only available with a minimum order of 50 x 20KG bags
    • No Voids - Long-term wear resistance
    • First time permanent repair - Ideal for remote locations
    • No waste - only use what is required
    • More than 50% recycled material per bag
    • SROH approved
    • No mechanical compaction required
    • Product Assessment Certification PA946 0006

    Size
    Pallet Quantity

    £1,020.28 (incl. VAT)

    £850.23 (ex. VAT)

    Quantity
    Please choose your colour
    Available for Delivery (See Delivery Options Below)

    Description

    Instarmac UltraCrete Enviro Mastic is a hot applied polymer modified mastic asphalt that gives superior performance in the patching and repairing of carriageways, footpaths, footways and cycle tracks or as a surface finish when installing street furniture and access covers.

    Product Assessment Certification PA946 0006 - click to see more conformance further below.

    Its unique design provides long-term wear resistance and eliminates voids, ensuring first time, high quality, permanent repairs and installations. It is ideally suited for use as a surfacing material surrounding road ironwork, gullies and other street apparatus. It is also suitable as a surface repair in foot & cycle paths and around utility reinstatements, as well as for local repairs, airfield repairs and surfacing of narrow trench reinstatements.

    Stored as a granular material, UltraCrete Enviro Mastic is poured from the bag on site, into a pre-heated mastic mixer, where it can be applied as a molten mastic repair or surfacing material.

    UltraCrete Enviro Mastic is a granular material made up of a blend of aggregates, recycled plainings and polymer modified bitumen pellets. The rubber modification in the mastic provides unique properties, both in application and performance. Supplied in 20kg bags the granular mix can be poured and heated in a purpose made mastic mixer onsite, allowing the exact quantity of material to be heated for use - so no waste.



    Quick Links - Click To Jump To Section:




    Features & Benefits


    • Hot applied polymer modified mastic asphalt
    • Superior performance in the patching and repairing of carriageways, footpaths, footways and cycle tracks
    • Also used as a surface finish when installing street furniture and access covers
    • No Voids
    • First time permanent repair
    • Long-term wear resistance
    • No waste - only use what is required
    • More than 50% recycled material per bag
    • SROH approved
    • Ideal for remote locations
    • No mechanical compaction required
    • Product Assessment Certification PA946 0006



    Conformance


    UltraCrete Enviro Mastic complies with the test requirements of the revised Specification for Highway Works (SHW), Clause 946 as defined in the Specification for the Reinstatement of Openings in Highways (SROH). Assessment of the product to meet such requirements is listed under PTS PAS Certification Ref: PA946 0006 issued by Pavement Testing Services Ltd (PTS Ltd).

    UltraCrete Enviro Mastic is manufactured to conform to the requirements of BS EN 13108 Bituminous Mixtures – Material Specifications, Part 6 Mastic Asphalt. Additionally its PTS Certification covers the incorporation of 50% + reclaimed aggregate within the confines of BS EN 13108.



    General Requirements


    UltraCrete Enviro Mastic requires a mastic mixer to heat the material ready for use. It should be ensured that the machine operator is fully trained in the use of the mixer and is fully compliant with Health & Safety requirements and hazards associated with gas heated mixers and the handling of hot materials.



    Preparation - Ironwork Reinstatement


    The installation area shall be clearly defined, before any work commences and the surrounding pavement/carriageway should be stable and structurally sound.

    The saw cut edges of the excavation around the ironwork or apparatus (“access surround”) should be within the required parameters, in line with the Specification for the Reinstatement of Openings in Highways (SROH) and should follow the guidance of S11.5 Ancillary Activities and more specifically the relevant sections of:

    • S6 Flexible & Composite Roads
    • S7 Rigid & Modular Roads
    • S8 Footpaths, Footways & Cycle Tracks

    Prior to using UltraCrete Enviro Mastic as the surface finish, the ironwork reinstatement should have been made good using UltraCrete bedding mortars (fully conforming to HA104/09) and flowable backfill concrete materials, approved for use and holding Product Acceptance Scheme Accreditation (PAS Certificate).

    The Ironwork and chamber installed should correctly match in size and the chamber should be of sufficient strength to support the frame & cover and expected loading for the category of road.

    When bedding the ironwork, the frame should be aligned using a string line, to ensure it is level with the surrounding surfaces and camber of the road, on all sides.

    The materials used for bedding the ironwork must be installed at a minimum depth of 10mm. The backfill flowable concrete must be installed at a minimum depth of 20mm over the flange of the ironwork and minimum of 50mm below the road surface/top of the ironwork.

    Once the backfill concrete has cured, spray a uniform application of UltraCrete SCJ Seal & Tack Coat, to prime all concrete surfaces, metal frame edges and saw cut asphalt edges.



    Installation of UltraCrete Enviro Mastic


    The operator should be familiar with pre-heating the drum of the mixer to warm the equipment if starting from cold and should the use equipment as per manufacturers’ guidelines.

    After pre-heating the mixer, add the required number of 20kg bags of UltraCrete Enviro Mastic, pouring the contents into the mastic mixer. Do not put plastic bag into the mix. The operator should be aware of the maximum/minimum quantities of material that the mixer can safely handle.

    Mix the material until it has melted and is reading between 180℃ & 190℃ on the mixer temperature gauge (always ensure the temperature gauge on the mixer is in full working order before you start). Ensure the product is thoroughly homogenous which may take approximately 1 hour depending on ambient temperatures, quantity of product in the mixer and type / capability of mixer in use.

    Regularly crosscheck accuracy of machine temperature gauges by using a laser temperature gun aimed at material as it is discharged from the mixer hatch.

    When it reaches the correct temperature and fluid consistency, discharge the molten material into a metal mastic bucket. Pour the material from the bucket into the prepared reinstatement and hand smooth using a mastic float to press and layer the material into position. Apply the material in layers of 20 - 50mm depth, pressing firmly and smoothing the surface to create a dense, level finish. Minimum overall installation depth of UltraCrete Enviro Mastic should be 50mm up to a maximum overall depth of 150mm.

    Allow each layer of the mastic to cool before applying the next, approximately 15 minutes, in order for it to solidify and create a firm base for the next layer.

    After the final layer has been applied and while the product is still molten, press either 8/14mm or 14/20mm graded, of pre-coated aggregate chippings, as required into the hot surface of the mastic to provide suitable surface texture. (The aggregate should be rated 65 PSV for lower category and 68 PSV for higher category roads). Chippings can be pressed into the mastic using hand roller or float or with the aid of a mechanical roller.

    Typical coverage rate for the chippings would be 8kg/sqm to 10kg/sqm for 8/14mm grade or 10kg/sqm to 13kg/sqm for 14/20mm grade.

    The product will set in 45 minutes to 1 hour dependant on depth, size of installation and ambient external weather conditions.

    The installation should not be trafficked for a minimum period of 1 hour to ensure product is set sufficiently to accept vehicle loading.



    Health, Safety and Environmental


    Please ensure that appropriate PPE is used when preparing, mixing and applying products. Always wash your hands before consuming food and make sure that materials are kept safely out of reach of children and animals. Please dispose of packaging and waste responsibly and in accordance with local authority requirements. A full material datasheet relating to this product is available to download from our attachments section above.



    Quality Assurance


    All products are manufactured in a plant whose quality management system is certified / registered as being in conformity with BS EN IS0 9001.

    Our products are guaranteed against defective materials and manufacture, and will be replaced or money refunded if the goods do not comply with our promotional literature. We cannot however accept any liability arising from the application or use of our products because we have no direct or continuous control over where and how our products are used. All products are sold subject to our conditions of sale, copies of which may be obtained on request.



    Technical


    Technical
    Unit Size:20kg bag. 50 units /pallet (1000kg)
    Appearance as supplied:Dry, pourable granular aggregate & rubber bitumen pellet mix
    Appearance in use:Black, molten, free flowing, granular, hot mastic
    Application Temp ℃:170℃ to 195℃
    Installation:Applied in 20mm to 50mm layers
    Min / Max Overall Depth:50mm to 150mm
    Surface Texture Aggregates:65 - 68 PSV - 8/14mm & 14/20mm, single sized, asphalt coated chippings, depending on road category.
    Traffic Access:Typically 1 hour after installing, depending on depth & ambient temperature conditions.
    % Recycled Material50%+ recycled material per 20kg
    Product Details
    4836-874920

    Data sheet

    Manufacturer
    Instarmac
    Interior / Exterior Use
    Exterior Use
    Colour
    Standard / Ready Mixed
    Single, Two or Three Pack
    Single
    Product Certifications
    HA104/09
    Pack Size
    20KG
    Parts
    1
    Mortar Type
    Polymer modified mastic
    Interior/Exterior Use
    Exterior
    Minimum Applied Thickness
    50mm
    Maximum Applied Thickness
    150mm
    Suitable Substrates
    Bedding mortars and flowable backfill concrete materials.
    Key Features
    Superior performance in the patching and repairing of carriageways, footpaths, footways and cycle tracks or as a surface finish when installing street furniture and access covers.
    Min. Application Temperature
    170℃ to 195℃
    Size
    20KG
    Layer Thickness
    Applied in 20mm to 50mm layers
    Waiting time
    Typically 1 hour after installing, depending on depth & ambient temperature conditions.
    Drying time
    45 minutes to 1 hour dependant on depth, size of installation and ambient external weather conditions.
    Suitable For Use On
    Asphalt
    Suitable For Use On
    Pavements
    Suitable For Use On
    Roads
    Application Method
    Pour
    Product Usage Type
    Mastic
    Product Range
    Ultracrete
    Attachments
    Download


    Customer agrees that before placing an Order, Customer has read and understood the most up to date Product Data Sheet for the Product. Where we have access to the Product Data Sheet from the manufacturer, we will either provide a copy on request, or include a link to the Product Data Sheet available on the manufacturer’s website. Customer further agrees that we have no liability for any errors or omissions contained within the Product Data Sheets. For more information, please see our Terms & Conditions of Sale.


    Be the first to ask a question about this product!


    Question about the product

    * Required fields
    (read)
    Send

    IMPORTANT SHIPPING & DELIVERY INFORMATION

    Instarmac UltraCrete Enviro Mastic is only available with the shipping and delivery timescales listed below - please do not contact our Customer Support Team with enquiries about alternative or earlier shipping and delivery times.

    Saturdays and Sundays, as well as Bank Holidays, are not classed as working days.

    Orders placed after the cut-off for this product will not be processed for earliest dispatch until 9am the next working day.

    All delivery costs below are excluding VAT